Facility handover and operation in five steps
The first month shapes the rest of the contract. These are the five steps and what you should receive at each one.
Request a free assessment visit for your facility
We will provide an operations and maintenance plan with a quotation.Request a visitFacility Manager Guide
The goal is for most of the team's hours to go to preventive work, not to chasing faults. This is how to build an annual plan that gets you there.
Scheduled work that prevents faults: inspection, cleaning and replacement before end of life. Example: cleaning AC coils and changing filters before summer.
Fixing a fault that does not stop work, scheduled by priority. Example: a dripping tap or a corridor light out.
A fault that stops work or affects safety and needs an urgent response. Example: AC failure in a critical area or a power cut.
| Period | Focus |
|---|---|
| March and April | AC, cooling towers and pumps before summer. |
| May to September | Electrical loads, water tanks and AC performance in critical areas. |
| October and November | Roofs, rainwater drainage and insulation. |
| All year | Lifts, safety systems, cleaning and pest control on their schedules. |
The clearest indicator is preventive maintenance completion: preventive tasks completed on time divided by tasks scheduled in the period. Track it monthly together with the number of emergency requests; if the plan works, emergencies fall over time.
Read next
5 min read
The first month shapes the rest of the contract. These are the five steps and what you should receive at each one.
6 min read
A line like “AC maintenance” invites disputes. A clear scope states what exists, where, how often and who does the work.
We will provide an operations and maintenance plan with a quotation.